Keystone oil pipeline resumes normal operations after disruption
The Keystone oil pipeline network resumed normal operations July 23 after a nearly weeklong reduction in capacity triggered by damage at a third-party electric substation, operator TC Energy said. The 590,000 b/d crude artery from Canada to the US operated at a reduced capacity since July 17 after vandalism damaged a transformer at an East River Electric Power Cooperative substation…